Project Highlights

This page showcases a selection of our recent work. Ranging from complex HVAC systems to innovative plumbing designs for clients across Manitoba and beyond.

With nearly two decades of experience, our team brings tailored engineering solutions to life, helping clients make confident, informed decisions every step of the way.

Explore how our expertise and client-first approach have shaped successful outcomes across a wide range of industries. 

University of Winnipeg - Central Plant Conversion Photo

University of Winnipeg - Central Plant Conversion

Winnipeg, MB

A new high-efficiency central energy plant to support the University of Winnipeg’s net-zero goals. A low-temp loop enables year-round, simultaneous heating and cooling.

Key features:

  • Separated geothermal/central loops for efficiency.
  • Reverse-acting chillers for winter heat transfer.
  • 350 geothermal boreholes (500 ft each).

Best Western Plus - New Building Photo

Best Western Plus - New Building

Neepawa, MB

Completed, 2025

A new four-storey, 72-suite hotel in Manitoba’s second-fastest growing community. Features include a pool and waterslide, fitness centre, and breakfast area.

Key features:

  • Performance path design with energy modeling.

  • PTAC units and gas-fired air handlers with overhead distribution.

  • Greenstone panels and heat recovery for pool ventilation.

  • 10%+ greater energy efficiency vs. typical hotel builds.

Onanole Fire Department - New Firehall Photo

Onanole Fire Department - New Firehall

Onanole, MB

Completed, 2024

A new firehall serving Riding Mountain National Park, replacing the outdated facility to better house vehicles and equipment.

Key features:

  • Code-compliant facility with meeting room, offices, and support spaces.

  • Simplified garage layout with in-floor heating.

  • Heat recovery ventilation for continuous conditioning.

  • Emergency exhaust system with CO and NO₂ detection.

Western Manitoba Centennial Auditorium - Building Condition Assessment Photo

Western Manitoba Centennial Auditorium - Building Condition Assessment

Brandon, MB

Completed, 2024

A full mechanical assessment of the historic 1967 performing arts venue.

Key features:

  • Review of plumbing, hot water heating, HVAC, and sprinkler systems.

  • Evaluated steam, chillers, air handlers, and controls.

  • Assessed compliance with historic and current building codes.

  • Delivered actionable guidance for system repairs and upgrades.

Ford Dealership - New Building Photo

Ford Dealership - New Building

Thompson, MB

Completed, 2023

A ground-up Ford dealership designed to perform in extreme temperatures from +27°C to -43°C.

Key features:

  • Energy modeling led to 25% reduction vs. prescriptive baseline.

  • High-efficiency HRVs (90%) for cold climate ventilation.

  • In-floor hydronic heating with energy cascade for comfort.

  • Upgraded envelope and air distribution for reduced load.

Trusted Solutions, Tangible Results

At MEER Engineering, every project is a reflection of our commitment to precision, performance, and partnership. Our commitment to performance, sustainability, and client collaboration ensures systems that not only meet code but exceed expectations.

HVAC equipment on roof.
Developer Console